The Pepper Hill Fire (Pennsylvania) – October 19, 1938

 

This Day in History is a brief summary of a powerful learning opportunity and is not intended to second guess or be judgmental of decisions and actions. Put yourself in the following situation as if you do not know the outcome. What are the conditions? What are you thinking? What are YOU doing?

Incident Summary:

Most of north-central Pennsylvania had been extensively logged by large timber companies from 1890 to 1930.  By 1938, fuels in the area consisted of very young second-growth hardwoods, ericaceous shrubs, and logging slash. Following an unusually hot and dry summer, a killing frost on October 7, caused the foliage to cure.  Precipitation for the previous three months had been substantially below normal. High temperatures persisted in the 80s with relative humidity (RH) of 20-25%.

At 1110 on October 19, 1938, the Hunts Run Civilian Conservation Corp (CCC) Camp #S-132 was notified of a possible forest fire. Upon investigation, several fires were located on Pepper Hill Mountain. Two CCC crews were dispatched to the fires. Both crews had just returned from a fire only hours before, and many enrollees requested to stay behind due to fatigue. All enrollees were ordered to go. The two CCC crews began initial attack from both flanks of the fire, anchoring into a nearby road. Both crews began constructing line from the heel of the fire to the top, burning out as needed.  For reasons which are still not clear, crew #2 was ordered to abandon their firing operation on the right flank and proceed to the head of the fire to construct direct downhill line. The crew was ¾ of the way up Pepper Hill Mountain when the fire below made a rapid run that overtook them. A few were able to find safety atop large nearby rocks. The remaining crew was severely burned, and ultimately eight of the young CCC enrollees would lose their lives.


Discussion Points:

Graphic map representing the location of the Pepper Hill Fire in 1938 showing the locations of the crew. Training – Most of the enrollees received little or no formal training.  They were expected to learn what to do on the job.

  • Most of us will work with new firefighters who have little or no experience. It is not reasonable or safe to assume they will learn everything on the fireline. How will your crew prepare new members for success?

Fatigue – Many of the enrollees assigned to the Pepper Hill Fire had just returned to camp from other fires at 0530 that morning.

  • Though we now have work/rest guidelines to help prevent fatigue, a long fire season can still take its toll on even the fittest firefighter. What signs might we see in our crew members that could indicate fatigue?
  • What impact can fatigue have on your crew, and what can you do to lessen the associated risks?

Tactics – The original plan to use the road as an anchor point seems sound, but poor choices were made on the right flank when the crew moved to the head and abandoned their burnout.

  • Without aviation support, would your crew engage this fire? If so, how?
  • Though not a sound decision at Pepper Hill, describe conditions where, while ensuring safety, attacking the head of a fire could be a viable tactic.

Crew Cohesion – The CCC Enrollees had not worked many fires together.  On their way up the hill, they became separated due to differences in physical ability.  There were no indications that their crew leader gave them any direction during this critical time.

  • No firefighter intends to get into a bad situation. We all train to avoid them, but what if? How would you and your crew manage the safety of all firefighters if faced with a similar situation?

 

 

 

Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee.


Follow NWCG on Twitter and Facebook

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Status/Check-In Recorder (SCKN)

Date: August 27, 2024
Contact: Incident Planning Subcommittee 

NWCG is excited to announce that the NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32, NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32, and Checking In Resources Customer Service Job Aid, J-111 are now available.

The Performance Support Package, which for SCKN includes the Incident Position Standards, Next Generation Position Task Book, and job aid were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Status/Check-In Recorder Position Page

NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32

NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32

Checking In Resources Customer Service Job Aid, J-111

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form