Skip to main content

Preparedness Level (PL) 5 Watch Outs

Preparedness levels are established locally, geographically and nationally to indicate that there are ongoing major incidents and potential to exhaust, or have exhausted, all agency fire resources. There are a number of factors which exist at this preparedness level that have the potential to impact firefighter safety:

  • Most or all levels of the fire management organization are operating at maximum capacity or even in crisis mode.
  • The incident support system is maxed out.
  • Resources needed to accomplish incident objectives are unavailable.
  • Fatigue is impacting individuals at all levels of the organization.
  • There is a sustained high operational tempo.

We must be mindful that these conditions reduce our margin for error.  The decisions we make have the potential to further reduce that margin, or to increase our capacity to cope with uncertainty.

Read this scenario and imagine that you are in a similar situation.

It is PL5 and you are on a rapidly growing Type 3 incident. There sources on the incident can’t keep up with the demands of the fire. An Incident Management Team (IMT) has been ordered but is not expected to arrive for multiple days. An engine crew has exceeded their 2:1 work/rest ratio for 3 days straight and is now overly fatigued, mentally and physically. The crew works a full day shift prepping line with chainsaws for the night shift’s planned burn operations.

The engine is a part of a task force responsible for completing a back burn and holding the line without the ability to bring in extra resources if things don’t go as planned. The engine crew consists of an Engine Boss (ENGB), an experienced assistant, a first-year crew member, and a local fuels tech with more than four years of fire experience but not as a primary firefighter. The assistant is involved in the burn and is working for the Firing Boss (FIRB), leaving the ENGB and two crew members to help with holding. Unfavorable winds during the night burn cause the firefighters to take smoke all night.

About six hours into the burn, the ENGB is faced with a decision. The task force needs a Heavy Equipment Boss (HEQB). As a trainee HEQB and the only available option, the ENGB is asked to leave the engine and provide direction to a dozer. At this point the ENGB takes a tactical pause to think about the timeline that got them to this point.

  • Scenarios like this are not uncommon during PL 5; we operate at high tempos for long durations often with narrow margins for safety. Take this time to discuss how you could create margin in this situation or share a personal story where you were stretched operationally and what you did.
  • Do we adjust our tactics during PL5 knowing it is unlikely we will get any additional resources?
  • Are there other circumstances when conditions like PL5 can occur?
  • What practices can you use to cope with the increase of expectations and operational tempo during PL 5 conditions?


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

Updated NWCG Guide for Wildland Fire Modules, PMS 431

Date: May 14, 2025
Questions?  Please contact:
Fire Use Subcommittee

The updated NWCG Guide for Wildland Fire Modules, PMS 431 serves as a supplemental resource for wildland fire module operations, providing information frequently used in the field.

PMS 431 defines the organizational structure, staffing, and qualifications for Type 1 and Type 2 Wildland Fire Modules, outlining their roles in wildland fire suppression, prescribed fire, and resource management. The NWCG Guide for Wildland Fire Modules, PMS 431, should be used in conjunction with the NWCG Standards for Wildland Fire Module Operations, PMS 430.

References:

NWCG Guide for Wildland Fire Modules, PMS 431

NWCG Standards for Wildland Fire Module Operations, PMS 430

Updated NWCG Standards for Wildland Fire Resource Typing, PMS 200 Now Includes Off-Highway Vehicle Typing Standards

Date: May 13, 2025
Questions?  Please contact:
Mobile Fire Equipment Subcommittee 

The NWCG Standards for Wildland Fire Resource Typing, PMS 200 has been updated to include newly developed Off-Highway Vehicle (OHV) typing standards. These standards organize OHV information into logical categories and outline key safety requirements for occupants.

NWCG Standards for Wildland Fire Resource Typing, PMS 200 establishes minimum typing standards for aircraft, crews, and equipment used in national mobilization to wildland fire incidents. Typing designations are assigned based on measurable capability and performance criteria.

References:

NWCG Standards for Wildland Fire Resource Typing, PMS 200

NEW! S-204, Interpersonal and Critical Thinking Skills for Safety Officers Now Available

Date: May 12, 2025
Questions?  Please contact:
Risk Management Committee

The S-204, Interpersonal and Critical Thinking Skills for Safety Officers self-directed online course is now available! Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Safety Officer, Field (SOFF) incident qualifications.

S-204, Interpersonal and Critical Thinking Skills for Safety Officers focuses on facilitating hazard mitigation conversations and building trust to influence safety-related decisions. Individuals can self-enroll through the Wildland Fire Learning Portal (WFLP).

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

S-204, Interpersonal and Critical Thinking Skills for Safety Officers 

NWCG Safety Officer, Field (SOFF) Position Page

Wildland Fire Learning Portal

Great Basin Cache Upgrading to New Inventory System

Date: May 7, 2025
Questions?  Please contact:
Great Basin Cache
Phone: (208) 387-5104
Fax: (208) 387-5573

The Great Basin Cache (GBK) is transitioning to a new inventory system to better serve the wildland fire community. During this upgrade, GBK will be unable to process standard orders from Part 1: Fire Supplies and Equipment and Part 2: Publications between May 8-20, 2025, with exceptions made for emergency fire orders. Orders will be accepted through close of business May 7.

To browse the latest available items, please refer to the National Fire Equipment System (NFES) catalogs. 

References:

NWCG NFES Catalog-Part 1: Fire Supplies and Equipment, PMS 449-1

NWCG NFES Catalog-Part 2: Publications, PMS 449-2