Skip to main content

Supply Unit Leader

SPUL Incident Position Description

The Supply Unit Leader (SPUL) is primarily responsible for ordering personnel, equipment, and supplies for wildland fire incidents. The SPUL is responsible for overseeing and supervising the ordering and receiving process and determining the right size inventory for the incident. The SPUL may supervise a Receiving and Distribution Manager (RCDM), an Ordering Manager (ORDM), or Camp Crews assisting in the Supply Area. The SPUL reports to the Logistics Section Chief (LSC) or the Support Branch Director (SUBD) and works in the Logistics functional area.

  • For additional information review Level 3 description, expected behaviors and knowledge, suggested development goals, and self-study opportunities.

Prepare and Mobilize

  • Ensure individual readiness.
  • Gather critical information pertinent to the assignment.
  • Travel to and check in at assignment.
  • Check in with incident supervisor and/or dispatch when arriving at the incident.
  • Review Incident Action Plan (IAP) and obtain briefing, objectives, and intent from supervisor.
  • Obtain briefing from previous shift/assignment SPUL as necessary.
  • Attend the Agency Administrator or Incident Management Team (IMT) in-brief.

Build the Team

  • Assemble and validate readiness of assigned personnel and equipment.
  • Establish and communicate chain of command, reporting procedures, risk management processes, and radio frequency management.
  • Establish a common operating picture with supervisors and subordinates.
  • Participate in operational briefings as directed.
  • Brief assigned personnel.
  • Identify assigned resources and maintain accountability.

Supervise and Direct Work Assignments

  • Establish and communicate objectives, priorities, work assignments, and performance expectations.
  • Identify, analyze, and use relevant situational information to make informed decisions and take appropriate actions.
  • Adjust actions based on changing information and evolving situation awareness. Develop and implement contingency plans. Communicate changing conditions to assigned resources and supervisor.
  • Ensure incident objectives and performance standards are met.
  • Monitor performance and provide immediate and regular feedback to assigned personnel.

Perform Supply Unit Leader-Specific Duties

  • Develop plans with the Ordering Unit to provide Operations and the Resource Unit with mobilization updates as required or needed daily.
  • Secure the Supply Unit footprint, develop the layout, and sign the Unit area appropriately.
  • Develop a kit that meets the needs of the Supply Unit (forms, tools, initial set up, etc.)
  • Establish Unit expectations and define any needs/meetings.
  • Review Supply Unit layout and communicate with Ground Support Unit Leader (GSUL), Security, and the Facilities Unit Leader (FACL) on access of deliveries, parking, and room to expand.
  • Review expectations for the RCDM on deliveries and with the ORDM on ordering process.
  • Maintain communication with Expanded Dispatch, Incident Business Advisor (IBA), Buying Team, and cache.
  • Obtain feedback from incident to ensure schedule of incoming supplies is appropriate.
  • Ensure requested time frames are met and deadlines are firm.
  • Develop delivery times for cache trailers to ensure supply needs are met.
  • Attend operational planning meetings as needed to coordinate incoming resource needs.
  • Ensure all inappropriate actions involving contractor personnel are reported to the Contracting Officer or Contracting Officer’s Representative (COR) using appropriate procedures.
  • Develop ordering statement or copy of General Message (ICS 213) for IAP.

Communicate and Coordinate

  • Follow established processes and chain of command for collecting, producing, and distributing information.
  • Ensure clear understanding of expectations and timely communication within and across Incident Command System (ICS) functional areas and chain of command.
  • Establish communications and exchange necessary briefings/information with the following:
    • Support resources
    • Adjacent resources
    • Supervisor
    • Other ICS functional areas
  • Communicate effectively using multichannel radios or phones. Prepare and program radios for assignment for Supply Unit Resources. Use plain language and ICS terminology.
  • Conduct and/or participate in After Action Reviews (AAR).
  • Prepare unit narrative and submit to LSC if applicable.
  • Prepare information for briefings and meetings.

Manage Risk

  • Apply the Risk Management Process as stated in the NWCG Incident Response Pocket Guide (IRPG), PMS 461:
    • Identify Hazards
    • Assess Hazards
    • Develop Controls and Make Risk Decisions
    • Implement Controls
    • Supervise and Evaluate
    • Consult with Safety and Security as necessary
  • Monitor for signs and symptoms of fatigue, illness, or injury. Mitigate appropriately.
  • Identify potential conflicts and resolve within the same operational period, if possible.
  • Ensure appropriate health and safety measures are adhered to in the Supply Unit.
  • Store and record all hazardous material in appropriate manner according to label.

Document

  • Complete, authorize, ensure timeliness of, and route as required:
  • Maintain records of supplies ordered and received and file daily.

Demobilize

  • Anticipate demobilization, identify excess resources, coordinate with operations/planning sections to prepare demobilization schedule, and communicate with supervisor.
  • Plan for demobilization. Brief assigned resources on demobilization procedures and responsibilities. Ensure incident and agency demobilization procedures and work/rest driving standards are followed.
  • Develop Supply Unit transition plan to include in the Logistics Transition Plan.
  • Communicate with Cache on truck schedule to return supplies and organize the packing of the trailer with shipping bill.
  • Communicate with LSC on labor needs to break down Supply Unit.
  • Return equipment and supplies to appropriate unit.
  • Complete demobilization checkout process before being released from the incident.
  • Upon demobilization, report status to home unit including reassignment or estimated time of arrival (ETA) to home unit.
  • During transfer of command:
    • Ensure continuity of operations.
    • Exchange critical safety information.
    • Communicate transfer of authority through established chain of command.
USWDS Paragraph Bundles

Last Modified / Reviewed:

Please Provide Feedback

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Status/Check-In Recorder (SCKN)

Date: August 27, 2024
Contact: Incident Planning Subcommittee 

NWCG is excited to announce that the NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32, NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32, and Checking In Resources Customer Service Job Aid, J-111 are now available.

The Performance Support Package, which for SCKN includes the Incident Position Standards, Next Generation Position Task Book, and job aid were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Status/Check-In Recorder Position Page

NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32

NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32

Checking In Resources Customer Service Job Aid, J-111

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form