Skip to main content

PMS 936

Event Geodatabase

Purpose

The Event Geodatabase (Event GDB) is the NWCG standard for use on all incidents and contains point, line, and polygon representations for typical fire features. The Event GDB was approved by the NWCG's Geospatial Subcommittee in the spring of 2017 along with the NWCG Wildland Fire Event Point, Event Line, and Event Polygon Data Standards. The Event GDB is used in all phases of a wildfire incident including initial attack, extended fire management activities, and rehabilitation and repair.

A standardized incident geodatabase schema is critical to the interoperability and efficiency of personnel and tools on a wildland fire incident. A consistent schema permits the development of tools and workflows to speed data management and mapping. A standard schema also allows incident data to be aggregated at the Geographic Area Coordination Center (GACC)​ and national level to provide a picture of the wildland fire situation.

The Event GDB is referenced several ways based on application (Offline Copy, Master Incident GDB, etc.). It is important to understand that because "Event" is a schema standard, the data in each of these is interchangeable. Different names designate the different implementation phases of the Event GDB in various workflows. The Event GDB is primarily implemented in the wildland fire enterprise through the National Incident Feature Service (NIFS).

Specifications

The Geographic Information System Specialist (GISS)​ will adhere to the following:

  • GISS and any other incident personnel working with incident spatial information must use the NWCG Approved Wildland Fire Event GDB standard for data storage and exchange.
  • The Event schema should not be modified.
  • Required data elements in the Wildland Fire Event GDB must be fully populated during the incident. The Event attributes serve as feature-level metadata for each record.
  • The Event GDB will be stored in the correct location in the Incident Directory Structure and follow File Naming conventions for GDB name.
  • The Event GDB will be backed up to provide a snapshot of the incident data daily or more frequently based on incident activity.
  • The required data elements FeatureAccess, FeatureStatus, and IsVisible are used by external systems to control the sharing of the incident data. Unless considered sensitive, the fire polygon will have FeatureAccess = Public, FeaturesStatus = Approved, and IsVisible = Yes (these are the default values for Event Polygon).

Required Fields

Click on image to enlarge.

Image

References

Responsibilities

The GISS is responsible for following the Event GDB standard and the specifications described in this section. The GISS will edit event data in an Offline Copy of the NIFS. The GISS will work with the Situation Unit Leader (SITL) to ensure all data in the Event GDB accurately represents the incident.

 

Modified / Reviewed:

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Status/Check-In Recorder (SCKN)

Date: August 27, 2024
Contact: Incident Planning Subcommittee 

NWCG is excited to announce that the NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32, NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32, and Checking In Resources Customer Service Job Aid, J-111 are now available.

The Performance Support Package, which for SCKN includes the Incident Position Standards, Next Generation Position Task Book, and job aid were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Status/Check-In Recorder Position Page

NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32

NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32

Checking In Resources Customer Service Job Aid, J-111

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form