Skip to main content

PMS 936

Map Product Standards

Purpose

Standards for typical maps produced by the Situation Unit used during wildland fire incidents are key to readability and uniformity.

GIS is rapidly changing how maps are delivered on incidents. Digital map products–geospatial pdf maps, websites or files–have become a large part of the Geographic Information System Specialist (GISS)​ workload. Requests for digital maps or data for smartphone applications, public information maps created for websites, maps to be projected during briefings, or files containing the underlying spatial data, have changed the way the GISS delivers incident products. There is a slow but continuous move away from hard copy paper products and to a digital product that can be updated rapidly for the field user.

The GISS will need to be flexible in applying these standards, as the Situation Unit Leader (SITL) and other end-users may have specific needs or preferences. The most important criteria in the preparation of map products are the operational business drivers (i.e., primary use) for the products. The primary use should drive the focus of the maps. Whether provided hard copy on paper or digitally via mobile device, the map product standards still apply.

Specifications

  • Maps produced on an incident should communicate the intended message clearly.
  • Use of standardized colors for maps printed in color; e.g., blue for water, green for vegetation.
  • Include S.T.A.N.D.L S.G.D on every map.
  • All incident map requests are channeled through the SITL or Planning Section Chief (PSC) so they are kept informed of the GISS workload and can help prioritize needs.
  • The SITL (or equivalent) decides which maps to produce and approves final versions.
  • The SITL directs the use of logos.
  • Placement of fire acreage (and total acreage reported) on maps is at the discretion of the SITL.
  • North arrow may need to be rotated to indicate true north correctly.
  • Maps may be requested that are not listed in this section. Those map products should adhere to standards detailed in other sections of GeoOpS.
  • Drafts: Maps that are for review only should include “DRAFT.”
  • Sensitive information: Maps should have a label defining the sensitivity of the data (e.g., “For Official Use Only,” “Not for Public Distribution or Use”).
  • Disclaimers: Maps may include disclaimers if requested or required under delegated authority (e.g., “For Reference Only”).
  • Proprietary information: Maps should cite the source for any proprietary information.

Incident Maps

References

Responsibilities

Timelines for map production are established with the SITL, PSC, or the assigned supervisor. The GISS generates all products on time for scheduled briefings and other meetings. Map definitions should be used as general guidelines; the SITL or PSC has the authority to deviate from the standards.

 

Modified / Reviewed:

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Status/Check-In Recorder (SCKN)

Date: August 27, 2024
Contact: Incident Planning Subcommittee 

NWCG is excited to announce that the NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32, NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32, and Checking In Resources Customer Service Job Aid, J-111 are now available.

The Performance Support Package, which for SCKN includes the Incident Position Standards, Next Generation Position Task Book, and job aid were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Status/Check-In Recorder Position Page

NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32

NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32

Checking In Resources Customer Service Job Aid, J-111

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form