9.8 Production Rates

When planning an attack on a fire, the length and width of the line must be estimated, along with the capabilities of the hand crew(s), to determine how many crews will be needed. Generally, a 15-person crew should be able to construct a 3-foot fireline around a 1-acre grass fire in 1 hour. Below are some average ideal rates for hand crew production rates in various vegetation.

hand crew production rates

Example 1 - Patricia spots a fire burning in open prairie. She determines that the fire has a perimeter of 1,800 feet. How many hand crews should she assign to construct a 3-foot line around the fire in 1 hour?

Step 1. Look under the column for grass vegetation of the hand crew production rates chart above. Follow the column down vertically.

Step 2. Look for the row that tells how much line a crew can cut per hour. Follow the row across horizontally. Where the two lines intersect is the number of lines per hour an average crew can cut in those conditions. 
One 15-person can cut 900 ft of line per hour

Step 3. Use this information to calculate the number of hours it will take one crew to construct 1,800 feet of line.

1,800 feet of line calculation
It will take 1 crew 2 hours to cut 1,800 feet of line.
Step 4. Determine how many crews it will take to construct the line in 1 hour.

1 crew 2 hours 1800 feed of line

To cut 1,800 feet of line in 1 hour, Patricia needs to assign two crews of 15 people each.
 

When arriving at a fire scene, always assess the entire situation to determine the best way to suppress the fire.

 

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Status/Check-In Recorder (SCKN)

Date: August 27, 2024
Contact: Incident Planning Subcommittee 

NWCG is excited to announce that the NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32, NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32, and Checking In Resources Customer Service Job Aid, J-111 are now available.

The Performance Support Package, which for SCKN includes the Incident Position Standards, Next Generation Position Task Book, and job aid were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Status/Check-In Recorder Position Page

NWCG Incident Position Standards for Status/Check-In Recorder, PMS 350-32

NWCG Position Task Book for Status/Check-In Recorder (SCKN), PMS 311-32

Checking In Resources Customer Service Job Aid, J-111

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form